Water

COT WA-01
WATERLINE CONSTRUCTION NOTESSeptember 7, 2017
COT WA-02WATER DISTRIBUTION MAIN BEDDING AND BACKFILL FOR OPEN CUT TRENCHESAugust 9, 2010
COT WA-03WATER LINE CROSSING STEEL CASING and STEEL CASING SCHEDULEAugust 9, 2010
COT WA-04C-900 WATER LINE OFFSET ASSEMBLY CONSTRUCTION DETAILSSeptember 7, 2017
COT WA-05STEEL WATER LINE OFFSET ASSEMBLY CONSTRUCTION DETAILSSeptember 7, 2017
COT WA-06POLYETHYLENE WRAP DETAIL and TABLE FOR BENDS, TEES, and PLUGSAugust 9, 2010
COT WA-07WATER LINE THRUST BLOCK FOR BENDS, TEES, and PLUGSAugust 9, 2010
COT WA-08MAIN LINE TAPPING SLEEVE and VALVE CONSTRUCTION DETAILAugust 9, 2010
COT WA-09FIRE HYDRANT DETAILSeptember 7, 2017
COT WA-10ALTERNATE FIRE HYDRANT PLANAugust 9, 2010
COT WA-11WATER LINE 2" BLOW OFF VALVE ASSEMBLY DETAILAugust 9, 2010
COT WA-12VALVE BOX DETAILAugust 9, 2010
COT WA-13WATER LINE AIR RELEASE VALVE BOX CONSTRUCTION DETAILSAugust 9, 2010
COT WA-14WATER LINE METER VAULT BOX CONSTRUCTION DETAILSAugust 9, 2010
COT WA-15TYPICAL 1” THRU 2” SERVICE ARRANGEMENTS CONSTRUCTION DETAILSNovember 22, 2017
COT WA-16WATER LINE SERVICE CONNECTION CONSTRUCTION DETAILJuly 25, 2018
COT WA-17SHOT BOX ENCLOSURE DETAILAugust 9, 2010

WATER COMBINEDJuly 25, 2018

* = Required
Asterisk denotes required document for all plan submittals